HomeSUPPORTINDUSTRIESSOLUTIONSPRODUCTSSERVICESNEWS & EVENTSABOUT USMY ACCOUNT
OverviewAsset ApplicationsBusiness ApplicationsControl ApplicationsOperations ApplicationsInstrumentationMachine Control & SafetyControl & Safety SystemsWirelessTerminal Automation ProductsProducts A-Z
Advanced Control & Optimization
>Profit Suite
>Profit Expert
>Profit Bridge
>Profit Controller
>Profit Controller Express
>Profit Design Studio
>Profit Loop
>ProfitMax
-Features
-Why Buy
-FAQs
-User Benefits by Role
-Literature
>Profit NLC
>Profit Optimizer
>Profit SensorPro
>Profit Stepper
>Profit Toolkits
>Profit Suite Visualization
Advanced Solutions for Power Generation
Alarm Management
Batch Management
Blending & Movement Automation
Simulation
Home > PRODUCTS > Control Applications > Advanced Control & Optimization > ProfitMax > FAQs
 

ProfitMax: Frequently Asked Questions

Q:  When is ProfitMax used?
A: ProfitMax is used for highly non-linear processes, or optimization problems that require integer optimization such as in some industrial energy applications.

Q: How does ProfitMax integrate with Profit Controller and Profit Optimizer?
A: ProfitMax sends steady-state optimization targets to Profit Optimizer or Profit Controller, and this ensures that the optimization targets are implemented feasibly in the plant.

Q: How does ProfitMax get its data?
A: ProfitMax uses Uniformance PHD as the single data source for inputs, and also all outputs are written to PHD. From PHD there are links to Profit Controller, Profit Optimizer, the control system, as well as other historians as required.

Q: How long does it take to implement a ProfitMax project?
A: Typical execution time is between 6 and 12 months from kick-off to site acceptance. 

Q: Does ProfitMax work with other APC products?
A: Yes, as long as the APC product has a mechanism for retrieving information to PHD (i.e. OPC) since ProfitMax directly interacts with PHD as its sole data source/repository.

Log In
Search

  Advanced Search
Contact Us
Contact Honeywell Process Solutions